Skip to content

DEPENDENCY UPGRADE: minor upgrades — 5 packages (minor: 2 · patch: 3) #3489

DEPENDENCY UPGRADE: minor upgrades — 5 packages (minor: 2 · patch: 3)

DEPENDENCY UPGRADE: minor upgrades — 5 packages (minor: 2 · patch: 3) #3489

Triggered via pull request March 5, 2026 17:29
Status Failure
Total duration 57s
Artifacts

build.yml

on: pull_request
Matrix: unit-test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
unit-test (18.12)
Process completed with exit code 1.
unit-test (22.11)
The strategy configuration was canceled because "unit-test._18_12" failed
unit-test (22.11)
The operation was canceled.
unit-test (20.19)
The strategy configuration was canceled because "unit-test._18_12" failed
unit-test (20.19)
The operation was canceled.
unit-test (24.11)
The strategy configuration was canceled because "unit-test._18_12" failed
unit-test (24.11)
The operation was canceled.
lint
Process completed with exit code 1.