-
Notifications
You must be signed in to change notification settings - Fork 4
Description
Starting point (Final Object) should be the Resource, not an Event. The 1. Branch seems redundant and ‘badly positioned’

Can we try to simplify the view? Make it a bit more high level for the moment? Like adding a Label: Type of project -Design/Service/Product and maybe group: modifications?
In the case of the Precious Hocker stool - Red https://interfacer.dyne.org/project/06596HWSNF10ABRZ6KPAZZ0FKW imho we should see something similar to:
Level I: The Ec. Resource the DPP refers to
- Modifications of this Resource, if any
- Contributors
- Contributions
Level II: Eventual Designs and Included Resources/Projects
Exp:
Level I - > Ec. Resource: Product - Precious Hocker stool - Red
Level II (for this Use-case, we have 3 ‘components’, same level)
-> Ec. Resource: Design Upcycling stool and side table furniture "Precious Hocker"
-> Ec. Resource: Service Furniture assembly prototyping
-> Ec. Resource: Product Plastic bars from recycled plastic flakes
*I tried checking if there are other issues with the same topic, hope I'm not duplicating another