Skip to content

Milestones

List view

  • Overdue by 11 year(s)
    Due by July 26, 2014
    5/9 issues closed
  • This milestone is to keep track of all the various documentation related things we need to do. Add issues related to documentation to this milestone as needed. Off the top of my head these are all the places we need to keep updated: Procedure-Book Wiki Readmes in this repo Docstrings and comments in code LTCCtrl logic graph Phidget sensor pinout

    Overdue by 11 year(s)
    Due by June 30, 2014
    1/1 issues closed
  • Now that all of the mission critical stuff is out of the way, we have a lot of ideas of how we want to change the look and feel of the Kivy app. This was what was listed in the old TODO: * Revamp logger/state display (fancy scrolling display) * Put it on a tablet * Integrate with telemetry capstone project * Fix Relay Label background color being too dark * Add shortcuts for a coordinated color palete

    No due date
  • This is the milestone where we do our own networking code. From the old TODO: * Local phidgets service (on LTC) and our own network communication code * Try to break the network (simulate high latency and drop packets)

    Overdue by 10 year(s)
    Due by June 10, 2015
    1/6 issues closed