Skip to content

Pull requests: EspressoSystems/optimism-espresso-integration

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Update error handling
#289 opened Dec 2, 2025 by shenkeyao Loading…
Support external link in enclave-tool
#288 opened Dec 2, 2025 by dailinsubjam Loading…
OP succint support
#287 opened Nov 29, 2025 by philippecamacho Draft
Bump golang.org/x/crypto from 0.35.0 to 0.45.0 dependencies Pull requests that update a dependency file go Pull requests that update go code
#282 opened Nov 20, 2025 by dependabot bot Loading…
Bump js-yaml from 3.14.1 to 3.14.2 in /op-e2e/celo dependencies Pull requests that update a dependency file javascript Pull requests that update javascript code
#280 opened Nov 18, 2025 by dependabot bot Loading…
Fallback Inbox contract changes
#278 opened Nov 14, 2025 by philippecamacho Loading…
Bump github.com/consensys/gnark-crypto from 0.16.0 to 0.18.1 dependencies Pull requests that update a dependency file go Pull requests that update go code
#249 opened Oct 30, 2025 by dependabot bot Loading…
Fix docker-compose
#229 opened Sep 10, 2025 by QuentinI Draft
TA4: Enclave restart test
#215 opened Aug 25, 2025 by QuentinI Loading…
Bump github.com/docker/docker from 27.5.1+incompatible to 28.0.0+incompatible dependencies Pull requests that update a dependency file go Pull requests that update go code
#208 opened Aug 14, 2025 by dependabot bot Loading…
Add CeloEspressoTimestamp for migration
#200 opened Jul 25, 2025 by dailinsubjam Loading…
[OP AUDIT] Fuzzing
#189 opened Jul 8, 2025 by jparr721 Loading…
ProTip! Follow long discussions with comments:>50.