Skip to content

chore(deps): bump github.com/attestantio/go-eth2-client from 0.27.1 t… #18411

chore(deps): bump github.com/attestantio/go-eth2-client from 0.27.1 t…

chore(deps): bump github.com/attestantio/go-eth2-client from 0.27.1 t… #18411

Triggered via push December 4, 2025 20:14
Status Cancelled
Total duration 2m 22s
Artifacts

pipeline.yml

on: push
build-and-push-container
51s
build-and-push-container
Matrix: ci
Matrix: ci-e2e
Fit to window
Zoom out
Zoom in

Annotations

15 errors
lint
Canceling since a higher priority waiting request for ci-refs/heads/main-tests exists
lint
The operation was canceled.
build-and-push-container
Canceling since a higher priority waiting request for ci-refs/heads/main-tests exists
build-and-push-container
The operation was canceled.
test-unit-cover
Canceling since a higher priority waiting request for ci-refs/heads/main-tests exists
test-unit-cover
The operation was canceled.
vulncheck
Canceling since a higher priority waiting request for ci-refs/heads/main-tests exists
vulncheck
The operation was canceled.
gosec
Canceling since a higher priority waiting request for ci-refs/heads/main-tests exists
gosec
The operation was canceled.
test-unit-bench
Canceling since a higher priority waiting request for ci-refs/heads/main-tests exists
test-unit-bench
The operation was canceled.
generate-check
Canceling since a higher priority waiting request for ci-refs/heads/main-tests exists
generate-check
The operation was canceled.
pipeline
Canceling since a higher priority waiting request for ci-refs/heads/main-tests exists