Skip to content

build(deps): bump actions/checkout from 4 to 6 #80

build(deps): bump actions/checkout from 4 to 6

build(deps): bump actions/checkout from 4 to 6 #80

Triggered via pull request November 24, 2025 14:20
Status Failure
Total duration 27s
Artifacts

run-tests.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
P8.1 - L9.* - prefer-stable - ubuntu-latest
Process completed with exit code 2.
P8.1 - L9.* - prefer-stable - ubuntu-latest
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires laravel/framework 9.* -> satisfiable by laravel/framework[9.x-dev]. - Root composer.json requires roave/security-advisories dev-latest -> satisfiable by roave/security-advisories[dev-latest]. - roave/security-advisories dev-latest conflicts with laravel/framework <10.48.29|>=11,<11.44.1|>=12,<12.1.1.
P8.1 - L9.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_1_9___p_2" failed
P8.1 - L9.* - prefer-lowest - ubuntu-latest
Process completed with exit code 2.
P8.1 - L9.* - prefer-lowest - ubuntu-latest
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires laravel/framework 9.* -> satisfiable by laravel/framework[9.x-dev]. - Root composer.json requires roave/security-advisories dev-latest -> satisfiable by roave/security-advisories[dev-latest]. - roave/security-advisories dev-latest conflicts with laravel/framework <10.48.29|>=11,<11.44.1|>=12,<12.1.1.
P8.1 - L9.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_1_9___p_2" failed
P8.1 - L9.* - prefer-stable - windows-latest
The operation was canceled.
P8.1 - L9.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_1_9___p_2" failed
P8.1 - L9.* - prefer-lowest - windows-latest
The operation was canceled.