refactor: Network Layer Refactoring and Optimization #748
swift-ci.yml
on: pull_request
Format (lint)
5m 29s
Matrix: Build and Test SDK
Annotations
4 errors
|
Format (lint)
Process completed with exit code 1.
|
|
Build and Test SDK (5.10)
Process completed with exit code 1.
|
|
Build and Test SDK (5.9)
The strategy configuration was canceled because "test._5_10" failed
|
|
Build and Test SDK (5.9)
The operation was canceled.
|