Skip to content

Bump chgnet from 0.3.8 to 0.4.2 #5882

Bump chgnet from 0.3.8 to 0.4.2

Bump chgnet from 0.3.8 to 0.4.2 #5882

Triggered via pull request October 14, 2025 17:09
Status Failure
Total duration 6m 4s
Artifacts

testing.yml

on: pull_request
Matrix: test-force-field-notebook
Matrix: test-non-ase
Matrix: test-notebooks-and-ase
Matrix: test-openff
automerge
0s
automerge
Fit to window
Zoom out
Zoom in

Annotations

28 errors
docs
Process completed with exit code 1.
test-non-ase (3.11, 2)
Process completed with exit code 127.
test-non-ase (3.11, 1)
Process completed with exit code 127.
test-non-ase (3.11, 1)
The strategy configuration was canceled because "test-non-ase._3_11_2" failed
test-non-ase (3.12, 1)
Process completed with exit code 127.
test-non-ase (3.12, 1)
The strategy configuration was canceled because "test-non-ase._3_11_2" failed
test-non-ase (3.11, 3)
Process completed with exit code 127.
test-non-ase (3.11, 3)
The strategy configuration was canceled because "test-non-ase._3_11_2" failed
test-non-ase (3.12, 3)
Process completed with exit code 127.
test-non-ase (3.12, 3)
The strategy configuration was canceled because "test-non-ase._3_11_2" failed
test-non-ase (3.10, 1)
Process completed with exit code 127.
test-non-ase (3.10, 1)
The strategy configuration was canceled because "test-non-ase._3_11_2" failed
test-non-ase (3.10, 3)
Process completed with exit code 127.
test-non-ase (3.10, 3)
The strategy configuration was canceled because "test-non-ase._3_11_2" failed
test-non-ase (3.10, 2)
Process completed with exit code 127.
test-non-ase (3.10, 2)
The strategy configuration was canceled because "test-non-ase._3_11_2" failed
test-non-ase (3.12, 2)
The operation was canceled.
test-non-ase (3.12, 2)
The strategy configuration was canceled because "test-non-ase._3_11_2" failed
test-force-field-notebook (3.10)
Process completed with exit code 127.
test-force-field-notebook (3.11)
Process completed with exit code 127.
test-force-field-notebook (3.11)
The strategy configuration was canceled because "test-force-field-notebook._3_10" failed
test-notebooks-and-ase (3.10)
Process completed with exit code 127.
test-notebooks-and-ase (3.11)
Process completed with exit code 127.
test-notebooks-and-ase (3.11)
The strategy configuration was canceled because "test-notebooks-and-ase._3_10" failed
test-force-field-notebook (3.12)
The operation was canceled.
test-force-field-notebook (3.12)
The strategy configuration was canceled because "test-force-field-notebook._3_10" failed
test-notebooks-and-ase (3.12)
The operation was canceled.
test-notebooks-and-ase (3.12)
The strategy configuration was canceled because "test-notebooks-and-ase._3_10" failed