Skip to content

Add --mypy-report-style #178

Add --mypy-report-style

Add --mypy-report-style #178

Triggered via pull request March 14, 2025 16:05
Status Failure
Total duration 1h 4m 3s
Artifacts

validation.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

11 errors
build (3.8)
Process completed with exit code 255.
build (3.9)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_8" failed
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_8" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_8" failed
build (3.13)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_8" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_8" failed