Skip to content

Fix/golang with tsuru yaml #27

Fix/golang with tsuru yaml

Fix/golang with tsuru yaml #27

Triggered via pull request August 15, 2025 17:58
Status Failure
Total duration 44s
Artifacts

ci.yaml

on: pull_request
Matrix: test
Matrix: publish
Fit to window
Zoom out
Zoom in

Annotations

4 errors
test (22.04)
Process completed with exit code 2.
test (24.04)
The strategy configuration was canceled because "test._22_04" failed
test (20.04)
Process completed with exit code 2.
test (20.04)
The strategy configuration was canceled because "test._22_04" failed