Skip to content

Revert lost PR

Revert lost PR #947

Triggered via push December 2, 2025 15:03
Status Failure
Total duration 6m 36s
Artifacts

ci.yaml

on: push
Prepare Maven cache
1m 54s
Prepare Maven cache
Matrix: YDB Java SDK CI on JDK
Fit to window
Zoom out
Zoom in

Annotations

7 errors
YDB Java SDK CI on JDK (8)
Process completed with exit code 1.
YDB Java SDK CI on JDK (17)
The strategy configuration was canceled because "build._8" failed
YDB Java SDK CI on JDK (17)
The operation was canceled.
YDB Java SDK CI on JDK (21)
The strategy configuration was canceled because "build._8" failed
YDB Java SDK CI on JDK (11)
The strategy configuration was canceled because "build._8" failed
YDB Java SDK CI on JDK (21)
The operation was canceled.
YDB Java SDK CI on JDK (11)
The operation was canceled.